Saturday 20 May 2017

Modular River Test Sections




I turned out a couple of test section of the modular river terrain today but, due to the damp weather, I've had to wait for them to dry out before I can undercoat them. In the end I abandoned my cunning plan to use string as foundation for the river bank edge and just slapped on a mix of PVA, filler and sand with a few stones pressed into the surface for good measure. The river was textured with acrylic modelling paste which is the bit that is still drying out, much to my annoyance, otherwise I would have sprayed both pieces already with Halfords Ultra Matt Khaki, ready for painting tomorrow.

No comments:

Post a Comment